Mount Maunganui
This project was approximately 96m3. Drainlayers would typically allow for an installation time of 2.5 days with a team of 4, using Stormcell the project was completed in a little under 8hrs.
Rob the Drainlayer
Stormcell at Peterkin St, Wingate, Lower Hutt – Peryer Construction Wgtn. Limited -Site
I've been in the Drainlaying industry for a solid 25 years, and I've always stuck to the traditional rock-filled soak pits. However, when I took on the Peterkin St project in Wingate, Lower Hutt, I noticed that Stormcell was specified as a system option. Despite being new to me, I decided to give it a shot, and I'm glad I did.
Not only did I successfully secure the project during the tender process, but ordering and receiving the stock was a breeze. What made the experience even better was the support and training provided by Hamish Knox, the area manager from Marshall Innovations.
I have to say, Stormcell is a fantastic product with an incredibly easy installation process. My team was pleasantly surprised at how quickly they could assemble the units. The support from Hamish from Marshalls "Groundco" was invaluable, and I'm confident in saying that I will definitely be using this product again in the future.
Rob the Drainlayer from Windy Wellington